Los Alamos High School

Location:

Los Alamos, NM

Services Provided:

Preconstruction, Construction Management

Architect:

Fanning Bard Tatum, Ltd., Architects

Owner:

Los Alamos Public Schools

Description:

  • Phase 1 Replacement of Classroom Wings B, C, & D
  • The project includes construction of a three-story building with 30 new classrooms, a new administration space with two conference rooms, two reception areas, and nine new offices.
  • The lower level includes a kitchen, food lab, sewing room, and a two-story dance and drama space.
  • The project was completed while school was in session, which required temporary partitions, portable buildings for class space and close interaction with the local utilities provider.
  • Flintco provided scheduling services, which reviewed the costs and benefits of multiple-phased construction approaches, ultimately leading to a five-phased approach.