The Summit at Douglas Ridge Office Building “B”
LOCATION
Roseville,
Calif.
OWNER
The
Westerra Group
ARCHITECT
Vitae
Architecture, Planning, Interiors
SERVICES PROVIDED
Construction
Manager - At Risk
PROJECT DATA
100,000
square feet
- Class A, three-story, structural steel
frame office building with exterior cladding comprised
predominantly of aluminum composite metal panels, decorative
natural stone and aluminum storefront.
- French limestone & Chinese slate stone
veneer assemblies.
- Facility contains cold-formed metal framing,
metal fabrications, piped and tube railings, ornamental
handrails and railings.
- The architectural cherry wood veneer with
a built-up roofing system boasts a four ply asphalt
membrane system, and hydraulic elevators.
We have selected Flintco to construct
Phase II of the Summit at Douglas Ridge. We have
been impressed with their integrity, responsiveness
and dedication to service.”
- Phil Clevenger, Vice President of Construction
The
Westerra Group
|